PETITION No. 2006Z -0101 SFC


 

PROPOSED ZONING                     C-1 (COMMUNITY BUSINESS) - 3,165 SQUARE FEET PER ACRE

 

PROPOSED USE                               RETAIL - 2,532 SQUARE FEET

 

EXISTING ZONING                           C-1 (COMMUNITY BUSINESS) - Z75-048 SFC

 

EXISTING USE                                    BABY GRAND PIANO BAR, FORMERLY

                                                CAPTAIN D'S SEAFOOD RESTAURANT

 

LAND USE MAP                                  NEIGHBORHOOD LIVE WORK

 

LOCATION                                              OLD NATIONAL HIGHWAY (SR 279)(EAST SIDE):

                                                                        110.10 FEET OF FRONTAGE

 

                                                                        PARCEL SIZE  .80 ACRES

 

                                                                        SMALL AREA 702

 

                                                                        LL 68, DISTRICT 13

 

                                                                        COMMISSION DISTRICT 7

                                                                       

                                                                        OLD NATIONAL OVERLAY DISTRICT

                                                                       

OWNER                                                    SOLID EQUITIES, INC.

 

PETITIONER                                         SOLID EQUITIES, INC.

 

REPRESENTATIVE                          RICK S. SEXTON


 

APPLICANT'S INTENT                    To develop 2,532 square foot of retail in an existing structure for an overall density of 3,165 square feet per acre. 

 


Department of Environment and Community Development

Recommendation

 

APPROVAL CONDITIONAL: 2006Z -0101 SFC

 

 

Community Zoning Board Recommendation

November 21, 2006

 

APPROVAL CONDITIONAL: 2006Z -0101 SFC

 


SUBJECT SITE AND SURROUNDING AREA:

 

            SUBJECT SITE: The subject 0.80 acre site is zoned C-1 (Community Business) and is developed with a restaurant, Baby Grand Piano Bar.  The site is approved C-1 (Community Business), pursuant to Z75-048 SFC, for a Captain D's Seafood Restaurant.   

 

            NEARBY AND ADJACENT PROPERTIES/ZONINGS: NON-RESIDENTIAL

 

**         North - Use: Vacant

            Petition: Z6Z-101 SFC

            Zone: C-1 (Community Business)

            Density: None Stated

           

**         Further North - Use: Car Wash & US Pay Day (Existing)

            Petition: Z75-051 SFC

            Zone: C-2 (Commercial)

            Density: None Stated

            Height: 30 feet

           

**         Further North - Use: Blimpie (Existing)

            Petition: Z77-088 SFC

            Zone: C-1 (Community Business)

            Density: None Stated

           

**         Further North - Use: Cash on Title (Existing)

            Petition: Z73-146 NFC

            Zone: C-1 (Community Business)

            Density: None

           

**         Further North - Use: Medical Clinic (Existing)

            Petition: 2002Z -0091 SFC

            Zone: C-1 (Community Business)

            Density: 6,863.03 square feet per acre

           

**         Further North - Use: Pharmacy (Existing)

            Petition: 2005Z -0011 SFC

            Zone: C-1 (Community Business)

            Density: 2,183.41 square feet per acre, 2,000 total square feet

                       

**         South - Use: Jackson Hewitt Financial (Existing)

            Petition: Z74-020 SFC

            Zone: C-1 (Community Business)

            Density: None Stated


**         Further South - Use: Yasims Seafood (Existing)

            Petition: Z73-017 SFC

            Zone: C-1 (Community Business)

            Density: None Stated

 

**         Further South - Use: El Nopol Restaurant (Existing)

            Petition: Z77-113 SFC

            Zone: C-1 (Community Business)

            Density: None Stated

           

**         Further South - Use: U-Haul Storage (Existing)

            Petition: Z87-09 SFC

            Zone:     C-1 (Community Business)

            Density: None Stated

 

**         West - Use: Sports Element Shoe Store (Existing)

            Petition: 2003Z -0021 SFC

            Zone: C-1 (Community Business)

            Density: 6,863.31 square feet per acre

 

**         Southwest - Use: Rent-a-Center (Existing)

            Petition: Z73-148 SFC

            Zone: C-1 (Community Business)

            Density: None Stated

           

**         Further Southwest - Use: Tax Refund (Existing)

            Petition: Z75-069 SFC

            Zone: C-1 (Community Business)

            Density: None Stated

           

**         Further Southwest - Use: Ankle/Foot Center (Existing)

            Petition: Z73-104 SFC

            Zone:   C-1 (Community Business)

            Density: 7,987.18 square feet per acre

 

**         Further Southwest - Use: First Class Realty (Existing)

            Petition: 2005Z -0066 SFC

            Zone: C-1 (Community Business)

            Density: 8,604.09 square feet per acre, 4,216 total square feet

            Height:

 

**         Further Southwest - Use: Club Ritz (Existing)

            Petition: Z75-066 SFC

            Zone:     C-1   (Community Business)                    

            Density: None Stated

 

**         Northwest - Use: Midas (Existing)

            Petition: Z73-176 SFC

            Zone: C-2 (Community Business)

            Density:  None Stated

 

**         Further Northwest - Use: Village Market Gas Station (Existing)

            Petition: Z72-103 SFC

            Zone: C-1 (Community Business)

            Density: None Stated

 

**         Further Northwest - Use: Owens Fine Foods (Existing)

            Petition: Z76-026 SFC

            Zone: C-1 (Community Business)

            Density: None Stated

           

            NEARBY AND ADJACENT PROPERTIES/ZONINGS: RESIDENTIAL

 

**         Further Southwest - Use: Biscayne Apartments (Existing)

            Petition: Z70-160 SFC

            Zone: A (Apartments)

            Density: None Stated          

            Minimum Heated Floor Area: None Stated

 

MISCELLANEOUS USES AND ZONING IN THE AREA:

           

**         Further Northwest - Use: Heritage Elementary School

           

**         Further West - Use: Meadows Operation Center (Fulton County Schools Administrative Offices)

 

**         East - City of College Park

           

**         There have been no RECENT DENIALS in the immediate area.

 

SITE PLAN ANALYSIS:

 

Based on the applicant's site plan submitted to the Department of Environment and Community Development on September 14, 2006, Staff offers the following considerations:

 

LAND USE AND DENSITY

 

The applicant is requesting to rezone the subject site from C-1 (Community Business), which is conditioned to Captain D's restaurant, to C-1 (Community Business) in order to allow uses which are permissible in the C-1 (Community Business) district.  The Comprehensive Land Use Plan Map suggests neighborhood live work for the subject site. The live work designation suggests a compatible mix of land uses, i.e. retail, office, services, institutional, civic and residential uses for the area.  The applicant's request for commercial use in the existing structure is compatible with the suggestion of the Map and with approved zonings in the area. Therefore, Staff recommends this petition be APPROVED CONDITIONAL subject to the attached Recommended Conditions.

 

BUILDING SETBACKS

 

According to Article 9.1.3 of the Zoning Resolution, the minimum building setbacks apply to the applicant's request as follows:

 

40-foot building setback along Old National Highway (front yard) (Article 9.1.3.B)

0-foot building setback along the north and south property line (side yards) (Article 9.1.3.C)

0-foot building setback along the east property line (rear yard) (Article 9.1.3.D)

 

The site plan shows compliance with the required building setbacks.  In addition, the buildings and all permanent structures, such as parking lots, shall be located outside of the required landscape strips, buffers, and improvement setbacks as listed in the following section, LANDSCAPE STRIPS AND BUFFERS. 

 

LANDSCAPE STRIPS AND BUFFERS

 

The subject site is required to provide the following landscape strips and undisturbed buffers with improvement setbacks per Article 4.23 and 12D of the Fulton County Zoning Resolution for the retail use.

 

15-foot landscape strip along Old National Highway (front yard) (Article 12D.3.A.1)

10-foot landscape strip along the north and south property lines (side yards) (Article 12D.3.A.2)

50-foot undisturbed buffer and 10-foot improvement setback along the east property line (Article 4.23.1)

a 10-foot wide island with a shade tree every 6th parking spaces (Article 4.23.2)

 

Staff notes that the existing driveway, parking, and fence encroach into the required landscape strips.  Should the Board of Commissioners grant the applicant's request to rezone, Staff has included in the Recommended Conditions a condition reducing all building setbacks to the extent necessary for existing structures to remain.

 

PARKING

 

Article 18 requires 5 parking spaces per 1,000 square feet of retail use and 10 spaces per square foot of restaurant use.  The proposed use is a 2,532 square foot restaurant.  Twenty-five parking spaces are required.  The site plan shows compliance with a total of 27 parking spaces.


ENVIRONMENT

 

The Environmental Site Analysis Report (ESA) is sufficient and satisfies the requirement of the Fulton County Zoning Resolution.  A field survey of the site was conducted by County Staff to verify areas addressed in the ESA report.  Compliance with County erosion control guidelines would mitigate developmental impacts.  The site does not contain wetlands, floodplains, streams, steep slopes, historical sites or sensitive plants and animal species.

 

OTHER CONSIDERATIONS

 

The site is located in the Old National Highway Overlay District.  At the time of application for a Land Disturbance Permit, Building Permit, or Sign Permit, it is the applicant's responsibility to comply with the development standards of the Overlay District.

 

 

FINDINGS:

 

(Article 28.4.1) Planning Staff shall, with respect to each zoning application, investigate and make a recommendation with respect to factors A. through G., below, as well as any other factors it may find relevant.

 

A.        WHETHER THE ZONING PROPOSAL WILL PERMIT A USE THAT IS SUITABLE IN VIEW OF THE USE AND DEVELOPMENT OF ADJACENT AND NEARBY PROPERTY.

 

FINDING:      The proposed commercial use, if developed with Staff's Recommended Conditions, is suitable for the subject site given the existing commercial developments in the surrounding area.

 

B.        Whether the zoning proposal will adversely affect the existing use or usability of adjacent or nearby property.

 

FINDING:      It is Staff's opinion that the proposed use will not adversely affect adjacent and nearby uses if developed in accordance with the attached Recommended Conditions.

 

C.        WHETHER THE PROPERTY TO BE AFFECTED BY THE ZONING PROPOSAL HAS A REASONABLE ECONOMIC USE AS CURRENTLY ZONED.

 

FINDING:      The subject site may have a reasonable use as currently zoned.

 


D.        WHETHER THE ZONING PROPOSAL WILL RESULT IN A USE WHICH WILL OR COULD CAUSE AN EXCESSIVE BURDENSOME USE OF EXISTING STREETS, TRANSPORTATION FACILITIES, UTILITIES, OR SCHOOLS.

 

FINDING:      The proposed development is not anticipated to have an adverse impact on the existing public facilities and services in this area, provided the Recommended Conditions are incorporated into the development of the subject site.

 

E.        WHETHER THE ZONING PROPOSAL IS IN CONFORMITY WITH THE POLICIES AND INTENT OF THE LAND USE PLAN.

 

FINDING:      The proposed use is consistent with the suggestion of the Comprehensive Plan Land Use Map, as well as Plan policies.

 

LAND USE PLAN MAP:    Neighborhood Live Work

 

Proposed use/ density:   Retail / 3,165 square feet per acre

 

The Comprehensive Land Use Plan Map suggests neighborhood live work along the Old National Highway corridor.  The City of College Park is east of the site.  Further west of Old National Highway, the Map suggests community facilities with residential use at a density of 3 to 5 units per acre to the north and west and residential 5 to 8 units per acre south of the community facility suggestion.

 

PLAN POLICIES:

 

Encourage a broad range of business types and an even distribution of employment centers among the major divisions of unincorporated Fulton County.

 

Direct future non-residential development to highway interchanges and intersections of major roads in a pattern of mixed-use, activity nodes.

 

F.         WHETHER THERE ARE OTHER EXISTING OR CHANGING CONDITIONS AFFECTING THE USE AND DEVELOPMENT OF THE PROPERTY WHICH GIVE SUPPORTING GROUNDS FOR EITHER APPROVAL OR DISAPPROVAL OF THE ZONING PROPOSAL.

 

FINDING:      Previous Board approval of C-1 (Community Business) on the site and in the area supports the applicant's request.

 

G.        WHETHER THE ZONING PROPOSAL WILL PERMIT A USE WHICH CAN BE CONSIDERED ENVIRONMENTALLY ADVERSE TO THE NATURAL RESOURCES, ENVIRONMENT AND CITIZENS OF FULTON COUNTY.

 

FINDING:      The proposed use is not considered environmentally adverse affecting natural resources, the environment, or the citizens of Fulton County. 

CONCLUSION:

 

Given the proposed use is consistent with the suggestion of the Comprehensive Land Use Map, Plan Policies and previous board action on the site, Staff recommends that the petition be APPROVED CONDITIONAL.

 

COMMUNITY ZONING BOARD MEETING

 

On November 21, 2006, the Community Zoning Board recommended that the petition be APPROVED CONDITIONAL.  At the time of print the applicant and the Old National Merchants Association were working on an agreement of excluded uses for the subject site.

 


RECOMMENDED CONDITIONS

 

If this petition is approved by the Board of Commissioners, it should be APPROVED C-1 (Community Business)CONDITIONAL subject to the owner's agreement to the following enumerated conditions. Where these conditions conflict with the stipulations and offerings contained in the Letter of Intent, these conditions shall supersede unless specifically stipulated by the Board of Commissioners.

 

1.         To the owner's agreement to restrict the use of the subject property as follows:

 

a.         Retail, service commercial and/or office and accessory uses, including all exterior food and beverage service areas, at a maximum density of 3,165 gross square feet per acre zoned or a total of 2,532 square feet, whichever is less, but excluding convenience stores with gas pumps, freestanding fast food restaurants and commercial amusements.

 

b.         Limit the height of the building to no more than 1 story.

 

2.         To the owner's agreement to abide by the following:

 

a.         To the site plan received by the Department of Environment and Community Development on September 14, 2006.  Said site plan is conceptual only and must meet or exceed the requirements of the Zoning Resolution and these conditions prior to the approval of a Land Disturbance Permit. In the event the Recommended Conditions of Zoning cause the approved site plan to be substantially different, the applicant shall be required to complete the concept review procedure prior to application for a Land Disturbance Permit. Unless otherwise noted herein, compliance with all conditions shall be in place prior to the issuance of the first Certificate of Occupancy.

 

3.         To the owner's agreement to the following site development considerations:

 

a.         Reduce all building setbacks, landscape strips, undisturbed buffers, improvement setbacks, and parking lot island requirements to the extent necessary for existing structures to remain.

 

4.         To the owner's agreement to abide by the following traffic requirements, dedications and improvements:

 

a.         Dedicate at no cost to Fulton County along the entire property frontage, prior to the approval of a Land Disturbance Permit, sufficient land as necessary to provide the following rights-of-way, and dedicate at no cost to Fulton County such additional right-of-way as may be required to provide at least 10.5 feet of right-of-way from the back of curb of all abutting road improvements, as well as allow the necessary construction easements while the rights-of-way are being improved:

 

55 feet from centerline of Old National Highway (SR 279) or as may be required by the Georgia Department of Transportation.

 

5.         To the owner's agreement to abide by the following:

 

a.         Prior to submitting the application for a (LDP) with the Department of Environment and Community Development, Development Review Division, arrange to meet with the Fulton County Traffic Engineer.  A signed copy of the results of these meetings will be required to be submitted along with the application for a Land Disturbance Permit.

 

b.         Prior to submitting the application for an LDP, arrange an on-site evaluation of existing specimen trees/stands, buffers, and tree protection zones within the property boundaries with the Fulton County Arborist.  A signed copy of the results of these meetings will be required to be submitted along with the application for an LDP.

 

c.         Prior to submitting the application for an LDP, the developer/engineer shall contact the Public Works Department, Water Services Division, and arrange to meet on-site with an engineer from the Surface Water Management Program (SWMP), who is responsible for review of Storm Water Concept Plan submittals.

 

d.         Prior to submitting the application for an LDP, the developer and/or engineer shall submit to the SWMP, through the Development Review Division, a project Storm Water Concept Plan.  This concept plan shall indicate the preliminary location of the storm water management facilities intended to manage the quality and quantity of storm water.  The concept plan shall specifically address the existing downstream off-site drainage conveyance system(s) that the proposed development surface runoff will impact, and the discharge path(s) from the outlet of the storm water management facilities to the off-site drainage system(s) and/or appropriate receiving waters.  As part of the Storm Water Concept Plan submittal, a preliminary capacity analysis shall be performed by the engineer on the off-site drainage system(s) points of constraint.  The capacity analysis shall determine the capacity of all existing constraint points, such as pipes, culverts, etc. from the point of storm water discharge at the proposed development site boundary downstream to the confluence of the receiving drainage course at a point where the drainage area is at least ten times the proposed development site area and the next downstream drainage area having a drainage area of fifty acres or more.  The critical capacity points shall be selected based upon the engineer's field observation, professional judgment, and limited field survey data.  The analysis shall identify the downstream properties pre and post-development 100-year water surface elevations, and for any post-development water surface elevation increase exceeding 0.05 feet, the developer shall acquire the applicable offsite drainage easement to accommodate the 100-year storm flow through impacted properties.  Where Fulton County has completed a model of the basin, it shall be used by the developer in the analyses.

 

e.         Where storm water currently drains by sheet flow and it is proposed to be collected to and/or discharged at a point, such that the discharge from the storm water management facility outlet crosses a property line, such discharge shall mimic pre-development sheet flow conditions.  A description of the method proposed to achieve post-development sheet flow conditions shall be provided as part of the Storm Water Concept Plan.  Should the method to achieve sheet flow across an external property line be unsuccessful, the developer shall acquire an easement(s) from the point of discharge to a point down gradient at a live dry weather stream sufficient to contain the 25 year storm flow or other location as approved by the Director of Public Works.  This condition will not apply when the storm water management facility is designed and approved to discharge directly to a stream or watercourse.

 

f.          A draft of the Inspection and Maintenance Agreement required by Fulton County Code Section 26-278 shall be submitted to the Department of Public Works with the Storm Water Concept Plan.

 

g.         The Inspection and Maintenance Agreement shall provide that all storm water management/detention facility outlet control structures shall be inspected, photographed, and cleaned, if necessary, on a monthly basis, by the owner.  The Inspection and Maintenance Agreement shall require that the design engineer shall prepare an operation and maintenance guidance document, for use by the owner and/or any professionals retained by the owner, to plainly describe the basic operational function of the facility(ies), including a description of a permanent marker post(s) which shall indicate that the level of sediment which, if exceeded, requires sediment removal.  The Inspection and Maintenance Agreement shall require an annual operation and maintenance report for all storm water management/detention facilities be prepared by a licensed design professional and submitted to the SWMP.  The annual report shall include monthly inspections, photographs, and documentation of the cleaning of storm water management/detention facilities outlet control structure(s) as well as an operational assessment of the facilities indicating that they do, or do not, function as described in the design guidance document (described above), and if they do not, a description of the specific actions to be taken to allow the facilities to function as intended.

 

h.         The required Inspection and Maintenance Agreement shall be recorded with the Clerk of Superior Court prior to issuance of an LDP, Grading Permit, or Building Permit associated with the development.

 

i.          The engineer/developer is required to submit, along with the application for an LDP, signed documentation verifying approval of the Storm Water Concept Plan.

 

j.          Where paved parking areas (including access aisles) are proposed to exceed 5,000 square feet, the storm water management facilities shall be designed to reduce pollutants such as oil, grease and other automobile fluids that may leak from vehicles.  A general description, or concept, of the storm water management facilities proposed to achieve the removal of such pollutants shall be submitted with the Storm Water Concept Plan.  A detailed design of such facilities shall be included in applicable documents for a land disturbance permit.

 

k.         With the application for an LDP, provide  documentation (such as channel cross-sections, centerline profile, etc.) describing the geometry of those  existing natural streams, creeks, or draws within the proposed development boundary which in the design engineer's judgment are at risk of erosion due to increased flow, provide a description of the basis utilized in judging areas to be at risk, and provide details on the Storm Water Management Plan of the post-development channel bank protection measures.

 

l.          The developer/engineer shall demonstrate to the County by engineering analysis submitted with the LDP application, that the  discharge rate and velocity of the storm water runoff resulting from the development is restricted to seventy-five percent (75%) of the pre-development conditions for the 1-year frequency storm event, up to and including the ten (10)-year frequency storm event.

 

m.        Drainage from all disturbed areas shall be collected and conveyed to a storm water management facility provided as part of the development.  The Storm Water Concept Plan shall identify any proposed areas with incidental and minor release of storm water not conveyed to such facilities, subject to the approval of the Director of Public Works.  Plans for any land disturbance permit shall show all proposed drainage patterns for the proposed development after its completion.  Any incidental release of unmanaged or untreated storm flows from any disturbed portion of the developed property shall be allowed only with the approval of the Director of Public Works.  Other than minimal incidental flows shall be specifically approved by the Director of Public Works.  Bypass flows will not be permitted except from undisturbed areas within a buffer or other protected easement.  Final plans shall provide for collection, conveyance and treatment of all approved incidental flows from developed lots or parcels, individual residences or building structures.

 

n.         Storm water management facility(ies) volumes shall be designed to achieve water quality treatment, channel protection, over bank flood protection and extreme flood protection, in accordance with the Georgia State Storm water Manual, except that the duration of release for water quality treatment shall be 48 hours.

 

o.         Approval of this zoning petition that depicts proposed conditions that are inconsistent with County design requirements and standards does not constitute a waiver of such requirements, unless specifically stipulated during the zoning petition hearing by the Board of Commissioners.

 

 

APPENDIX

 

COMMENTS ON PUBLIC SERVICES AND UTILITIES

 

NOTE: Various Fulton County departments or divisions that may or may not be affected by the proposed development provide the following information. Comments herein are based on the applicant's conceptual site plan and are intended as general non-binding information and in no manner suggest a final finding by the commenter. All projects, if approved, are required to complete the Fulton County Plan Review process prior to the commencement of any construction activity.

 

TRANSPORTATION FACILITIES:

 

Road name: Old National Highway (SR 279)

Classification: Arterial Collector

Level of Service: C or better

 

Anticipated Traffic Generation Rates:

Average:  623 trips per day

Peak Hour: AM 17 trips; PM 55 trips

 

HEALTH DEPARTMENT:

 

The Fulton County Health Department recommends that the applicant be required to connect the proposed development to public water and public sanitary sewer available to the site.

 

This facility must comply with the Fulton County Clean Indoor Air Ordinance.

 

Since this proposed development is a food service facility, the owner must submit kitchen plans for review and approval by this department before issuance of a building permit and beginning construction.  The owner must obtain a food service permit prior to opening.

 

This department is requiring that plans indicating the number and location of outside refuse containers along with typical details of the pad and approach area for the refuse containers be submitted for review and approval.

 

WATER AND WASTEWATER (SEWER):

 

WATER:

 

Anticipated water demand: 5,555 gallons per day

 

This project is within the City of Atlanta jurisdiction.

 

SEWER:

 

Basin: Morning Creek

Treatment Plant: Morning Creek

Anticipated sewer demand: 5,000 gallons per day

 

The nearest wastewater pipeline to this project is on site located in Land Lot 68, District 13.

 

Comments: This information does not guarantee that adequate sewer capacity is available at this time or will be available upon application of permits. Please contact the Department of Public Works for more information.

 


DRAINAGE:

 

Flood Plain: F.I.R.M. Panel No. 13121C0476E.  Zero percent flood plain.

 

BOARD OF EDUCATION:

 

No Comment.

 

TAX ASSESSOR:

 

Property Tax ID#: 13-0068-LL-177-9

 

Taxes on the subject property are up-to-date.

 

FIRE MARSHAL:

 

Fire Station: 7

Battalion: 1

 

Impact: Will increase traffic congestion.

 

POLICE DEPARTMENT ZONING IMPACT STATEMENT:

 

Beat: 29

 

Impact Statement on Beat:

Current calls for service: 10,740

Projected calls for service: Unknown

**** Current average response time: 10 minutes

 

** Increase in the number of residents: 5

 

* Increase in E-911 calls  for service (police, fire, E.M.S.): 13

 

*** Increase in the number of traffic accidents: 0.3

 

PROJECTED IMPACT ON DEMAND FOR POLICE SERVICES:

 

It is the policy of the Fulton County Police Department to answer all calls for service regardless of the impact of a particular development. However, two of the most noticeable indicators of the quality of police service will be as follows: As demands for service increase, police response time to calls will increase. Time available for proactive neighborhood/business patrol will decrease and crime prevention efforts will decline.

 

The Police Department does anticipate a significant impact on demand for police services.

 

*           Based on 1998 population of 222,794 and 1998 total calls for service of 584,054 (194,242 for police services).

**          Based on average single family residence population of four, average apartment population of two and 1.96 persons per 1,000 gross square feet of space.

***        Based on 1998 accident calls of 8,009.

****       Based on average response time of 10.7 minutes (North Fulton) and 8 minutes (South Fulton).

*****      Based on average of two (2) cars per single family residence.

 

Note: The demand for police service is determined by socio-economic, legislative and other forces which do not lend themselves to predictability. Therefore, projections are made from historical data only. (There has been a 13.96% increase in calls for police service from 1996 to 1997)

 

EMERGENCY SERVICES:

 

If zoning petition is approved there will be an increase in E911 call volume.  The increase may negatively affect the Department's call answering speed and service level.

 

Increased traffic volume without road improvements may increase response times of emergency response vehicles thereby reducing effective delivery of emergency services.

 

CITY OF ATLANTA DEPARTMENT OF AVIATION (DOA)

Hartsfield-Jackson Atlanta International Airport

 

The proposed project is located approximately 1.5 miles south of the Airport.

 

Is the proposed project located under protected airspace for the Airport?

 

 Yes              No

 

Is the proposed project located within an area of significant aircraft noise exposure?

 

 Yes              No

 

If yes, is the proposed land-use deemed compatible according to CFR Title 14, Part 150?

 

 Yes              No

 

For complete information regarding the location of the property in question relative to aircraft noise exposure and the aircraft operational environment please refer to the DOA NOMS Developer's Pack on file at the Fulton County Government Center, Department of Environment & Community Development, Zoning Division.